House GW | ||
| 2021-22, Construction planned for 2024 | |||
| Type | low-energy retrofit; extension | ||
| Place | Munich | ||
| Client | private | ||
| Energy | Effizienzhaus | ||
| /climate protection | before 11878 CO2 Eqv. kg/a | ||
| after XX CO2 Eqv. kg/a | |||
House GW (1956) will get a new top floor. The pitched roof truss will be replaced with a new timer structure and a flat roof - in order to create more living surface and an extra extra child's room. These change will be taken as an opportunity to to lower the energy-demand and to transition towards a heating system based on renewable energies (water-heatpump, PV) and to adapt the house to modern living requirements. The new construction will be built as timber-construction. For all materials the emphasis is being placed on ecologic and healthy materials. The windows, which have been replaced recently are being kept, until the end of there life-cycle. |
|||